Agreed Supply Capacity vs Supply Size: Why They Aren’t the Same Thing

By Kenny Cook EngTech MIET There are two numbers that describe how much power a commercial building can have, and people mix them up all the time. One is the physical size of the supply. The other is what the network operator has agreed you can take. Knowing the difference can save you a nasty surprise. Supply size: what the cables and fuse can carry This is the physical connection: the cable, the cut-out and the main fuse, rated in amps. A 200A three-phase supply can physically carry about 139kVA. Agreed supply capacity: what you are allowed to take The agreed or authorised supply capacity (often shown as ASC or "available capacity" on half-hourly metered bills) is the amount in kVA that the network operator has agreed to provide to that site. It's part of your connection agreement, and it can be well below what the cable and fuse could physically handle. If your demand goes over the agreed capacity, many suppliers add excess capacity charges, and the network operator can ask you to apply for a formal increase. Why the difference matters Moving premises: a unit with a big main fuse may still have a low agreed capacity. Ask...

What Happens During a Power Load Survey? A Step-by-Step Guide

By Kenny Cook EngTech MIET A power load survey sounds technical, but for you it's one of the least disruptive jobs we do. Here's what happens from start to finish, so you know what to expect. 1. A quick chat about what you need to know Are you moving premises, adding EV chargers, buying new machinery or chasing a tripping problem? The reason for the survey decides how long we log for and what the report focuses on. 2. Fitting the logger One of our engineers connects a power logger at your incoming supply or main switchboard. The current clamps fit around the cables, so in most cases there's no need to switch your power off. It usually takes under an hour, and the logger is locked away safely while it records. 3. Logging: 7 days or 14? 7 days captures a full working week, including the weekend, and is enough for most offices, shops and light industrial sites with a steady routine. 14 days is better if your workload varies from week to week, you run shifts, or there's equipment that only runs occasionally. Two weeks gives a much more reliable peak. Seasonal sites are worth thinking about too....

Installing EV Chargers? How to Find Out If Your Business Has Enough Power

By Kenny Cook EngTech MIET The first question with workplace EV charging isn't which charger to buy. It's how many your electricity supply can actually support. Get that wrong and you'll either trip the main fuse on a busy afternoon or pay for an upgrade you didn't need. What EV chargers draw 7kW single-phase charger: around 32A on one phase. 22kW three-phase charger: around 32A on each phase. Rapid DC chargers: 50kW and up, which usually means a dedicated supply. Ten 7kW chargers spread across three phases add more than 100A of load on top of everything the building already uses. That's why the existing demand matters so much. Measure first, then design The wiring regulations require the maximum demand of an installation to be assessed before adding load. On a busy commercial site, the most reliable way to do that is to measure it. A power load survey logs your supply over a normal working week, so we can see your peak demand and, just as importantly, when it happens. If your peak is mid-morning and most cars will charge in the afternoon or overnight, you may have more spare capacity than you think. Your options once you know...

Leasing a Commercial Unit? How to Check the Power Supply Is Big Enough

By Kenny Cook EngTech MIET Agents will tell you about floor area, parking and loading doors. They rarely tell you whether the building has enough power for your business. Find out after you've signed, and an upgrade can mean months of waiting and a big bill. Here's how to check before you commit. Step 1: Find out what you use now You can't judge a new unit without knowing your current demand. Your bills may show a maximum demand figure if your site is half-hourly metered, but they don't show what's happening minute by minute or on each phase. A power load survey at your existing premises gives you a reliable peak figure in kVA, plus the pattern of when it happens. If you're moving two sites into one, survey both. Peaks don't always line up, so the combined demand is often less than adding the two maximums together, but you need the data to prove it. Step 2: Ask the right questions about the new unit What size is the supply? Ask for the main fuse rating in amps and whether it is single or three phase. What is the agreed (authorised) supply capacity in kVA? This is the...

What Is kVA? Your Electrical Supply Explained in Plain English

By Kenny Cook EngTech MIET If you've ever asked a landlord, agent or the network operator how much power a building has, you've probably been given a number in kVA. It's the figure everything else hangs off, but hardly anyone explains it. Here's what it actually means for your business. kVA, kW and amps: three ways of describing power Amps are the current flowing through your cables. Your main fuse and switchgear are rated in amps, for example 100A per phase. kVA (kilovolt-amps) is the "apparent power" your supply can deliver. It's what the network operator sizes your connection by, and it's the figure on many business electricity bills as your agreed or authorised capacity. kW (kilowatts) is the useful power your equipment turns into work, heat or light. Because of power factor, kW is usually a bit lower than kVA. A site drawing 90kVA at a power factor of 0.9 is using about 81kW of real power. How to turn amps into kVA You can get a rough figure from the rating of your main fuse: Single phase: 230V × amps ÷ 1,000. A 100A single-phase supply is about 23kVA. Three phase: 400V × amps × 1.732 ÷ 1,000....

PAT Testing vs Fixed Wire Testing: What’s the Difference?

By Kenny Cook EngTech MIET We're often asked to quote for "electrical testing", and it turns out the customer means PAT testing, or fixed wire testing, or isn't sure which they need. They're two different things, and most businesses need both. Fixed wire testing: the building's installation Fixed wire testing covers everything that's part of the building: the main switchboard, distribution boards, cables, sockets, light fittings, switches and the supplies to fixed equipment. It's carried out to BS 7671 and recorded on an Electrical Installation Condition Report (EICR). As a guide, offices, shops and schools are usually tested every 5 years, and industrial units and warehouses every 3 years. See how often a commercial building needs an EICR. PAT testing: the equipment you plug in PAT (portable appliance) testing covers the electrical equipment that plugs into the installation: computers, kettles, extension leads, power tools, heaters and so on. It follows the IET Code of Practice for In-service Inspection and Testing of Electrical Equipment. There's no fixed legal interval. The current edition of the Code of Practice takes a risk-based approach, so the frequency depends on the type of equipment, where it's used and how it's treated. A power tool on...

Send Us a Message

Spark a Conversation

Whether it’s a residential, commercial, or industrial project, we’re committed to delivering exceptional workmanship and outstanding customer service. Contact us today to discuss your electrical requirements or to schedule a consultation, and let’s keep your electrical systems operating at their best.